Key Points

A preliminary budget is a range of where the project is expected to land, and it becomes a firm, fixed price at the end of pre-construction, once the final plans are done and everything is priced.
Leave some room in what you plan to spend for upgrades while you choose finishes, and decide every finish before you sign the construction contract, because after that, every alteration you ask for is a change order.
A reserve of 5 to 10% in a separate account, or about 15% for a home 50 or more years old, covers what shows up once walls and floors are open.

Say the number on a remodel proposal is one you can live with. You want it to still be that number when the job is done. A lot of what makes that happen gets decided before any work starts.

You’ll learn:

  • How to tell whether your starting budget is realistic
  • How pre-construction turns a price range into a fixed price
  • Why every selection has to be made up front
  • How to keep your own changes from raising the price
  • What can still change the price after you sign, and how big a reserve to keep

How Do I Know My Starting Budget Is Realistic?

Kitchen with blue lower cabinets, white upper cabinets, a stainless range and hood, and woven counter stools at the peninsula.

Your starting budget is realistic when it’s at or above where projects like yours start, and that’s often more than people expect. Maybe you’ve saved a dream kitchen on a Pinterest board and pictured it at $75,000, but it might really cost $200,000. A lot of people don’t know what things cost, and that’s okay, which is why we talk about budget right up front.

Here is where a few common projects start in Charlotte and Lake Norman:

  • A full-gut kitchen remodel starts at about $150,000, and that doesn’t include appliances.
  • A full-gut primary bath starts at $60,000.
  • A whole-home remodel starts at $350,000 with builder-grade finishes, $475,000 with nicer finishes, and $570,000 with top-end finishes and some structural changes inside the house.

Think of these as starting points. We price each job by the materials it needs, the people it takes, and how long it takes.


How Does Pre-Construction Keep My Price From Climbing?

Before we promise you a price, we have to know what the job really costs. Pre-construction is where we work that out with you, based on your actual selections, the code requirements, and the conditions inside your house.

While your plans and selections come together, we keep a list of everything that wasn’t in the preliminary budget, with about how much each item added. So when the number moves, you can see what moved it, whether it was something you asked for or something the designer you work with chose.

Code work we can see coming goes into your final price. A kitchen remodel usually means code upgrades for the plumbing, electrical, and HVAC trades.

We pull permits on everything we do. In Mecklenburg County, work that alters the plumbing, electrical, or heating and air systems needs a permit. During pre-construction, each licensed trade walks your house and checks what’s there against the plans. We can’t always catch code updates in the preliminary budget, which is why that first number is a range.

Once the final plans are done and everything is priced, that range becomes a fixed price.


What Makes a Guaranteed Price Different From an Estimate?

An estimate gives you a range of where the project might end up, while a guaranteed price is one number at the bottom of the page that the builder stands behind. You might get 2 proposals that look that different.

Our preliminary budget is the first kind, and the price we give you at the end of pre-construction is the second. From then on, it’s a guarantee we stick to, and meeting it is our risk, not yours, as long as the conditions in your house, the plans, and your selections are what we priced.

Bathroom vanity with fluted wood cabinet fronts, a white countertop, a black-framed mirror, and a brass wall sconce.

A single bathroom holds a lot of decisions: the vanity, the faucet, the mirror, the wall sconce, and the floor.

Across a whole house, selections include cabinetry, countertops, tile, decorative lighting, and floor and wall colors. We politely require every one of them before you sign the construction contract, because we can’t put our guarantee on a price without them.

If you’re working with a designer, the choices go in the plans or in the designer’s lookbook, so everything is written down.


What Can I Do to Keep My Own Changes From Raising the Price?

You control 2 things: how much room you leave for upgrades, and when you make your decisions.

Say you fall for a tile that costs more than the one in the plan. We assume you’ll probably want to upgrade something while you pick your finishes, and upgrading one thing in a room usually means upgrading the others to match. So leave some room in what you plan to spend while you choose.

The other thing in your hands is timing. Make your decisions before you sign, because after that, every change you ask for is a change order, and every change order costs more money. A late decision or a change of mind can also add weeks of managing the job, and that time has a real cost.


What Can Still Change the Price After We Sign?

Besides the change orders you can control, only 2 things bring a change order: something we find behind a wall or under a floor, or extra work an inspector asks for that’s outside the norm. The final number can also move with an allowance, a set amount for an item that isn’t chosen yet, if what gets chosen costs more or less.

Once the contract is signed, our price is guaranteed for everything documented in the contract, the plans, or your selections.


What Happens When Something Goes Wrong That Is Nobody’s Fault?

When something turns up that nobody could have seen, we work out the facts and possible solutions as a team first, then bring them to you in plain language so you can decide how to move forward. In renovation, surprises like that come up all the time, usually right after demolition, once the framing is exposed.

Walk-in shower with white marble-look wall tile, a window, a handheld shower on a slide bar, and a patterned mosaic floor.

On our whole-home remodel in Historic Dilworth, the window in a second-floor bathroom had been leaking, and from inside the house there was nothing to see. The framing around it was rotten, and so was the window, and we had to fix that before moving forward.

A find behind the walls is one of the few things that brings a change order after you sign. That’s why we suggest keeping a reserve of your own: 5 to 10% of your remodel budget in a separate account, or about 15% for a home 50 or more years old. For a bathroom, plan in your head for about 15 to 20%.


Ready to Talk Budget With Watershed Builders?

If you’re planning a remodel in Charlotte or Lake Norman, we’ll help you find a realistic starting number and walk you through how it becomes a fixed price. Fill out our contact form or give us a call.

author avatar
Dominick Thompson

Frequently Asked Questions

What do older homes hide that can raise the price?

An older home has more history, more mistakes, and more things that need to be updated to today's code. If a shower wasn't well waterproofed, you should expect to find water that has leaked over the years and may have caused rot. In a home that's 15 years old or older, there's a good chance the bathroom fan ventilation isn't up to code and needs to be changed.

Read More From Watershed Builders

White kitchen with a large island, a stone countertop, two glass globe pendants, and three black spindle-back stools.

How Do I Vet a High-End Remodeler?

To vet a high-end remodeler, confirm the license and insurance, look at finished projects like yours, and compare what each...