You’re picturing the day the crew shows up, and the walls start coming down on your whole-home renovation. A lot of work happens before that day, and most of it is planning with you and the designer you work with.
You’ll learn:
- What you get out of pre-construction
- How long it takes
- Who helps you make the decisions along the way
- How to plan for what’s behind the walls
- Whether you need to move out
- What happens between signing and demolition day
What Happens First?
We have a discovery video call to find out if we’re the right fit for you. If we are, we come to your home for a consultation, and once there are plans to price from, we give you a preliminary budget: the range where we think your project will land.
The pre-construction phase comes next.
What Does the Pre-Construction Phase Actually Produce?
Pre-construction produces a final scope of work and a fixed price we guarantee, in place of the price range you start with.
In it, we take your preliminary budget down to the final penny: our team goes through the existing conditions of your house and every requirement of the project, using your final drawings and selections.
You’ll also see how the number got from the range to the final price, because we list each item that wasn’t in your preliminary budget and about what it added.
How Long Does Pre-Construction Take Before Demolition?
Plan on at least 3 to 4 months of pre-construction work with us before you sign the construction contract. Some clients take longer, like one client we worked with for a year before signing. How long it takes depends a lot on the designer’s schedule.

On our whole-home remodel in Historic Dilworth, it took 7 months to get from the preliminary budget to the final price, and then about 5 months to remodel the house, kitchen included.
Who Guides Us Through the Decisions Before Demolition?
Picking cabinets, countertops, tile, fixtures, lighting, and paint colors for a whole house is a headache at the beginning of a job. That’s why most of our clients work with an interior designer.
The designer you work with helps you through every selection. Then we get final prices from our vendors and trades for everything the designer picks.
If you don’t already have a designer, we can bring one to the table that has a winning track record and works seamlessly with you and our team.

In the plans for our Historic Dilworth remodel, the primary bath vanity is designed down to every cabinet size and where an outlet has to go. The designer works through details like these with our cabinet builder.
How Does the Price Plan for What’s Behind the Walls?
Before you sign, each licensed trade walks your house and checks its existing conditions against the plans, so every code update they can spot is in your fixed price.
What they can’t see is covered by a reserve of your own: keep 5 to 10% of your budget in a separate account, or about 15% for a house 50 or more years old. An older home has more history, more past mistakes, and more things that need updating for today’s code, so expect more to turn up.
Will We Need to Move Out?
Whether you live in the house during the renovation is up to you. It’s your home.
On some jobs, there’s so much work that the house won’t have working utilities, which we always discuss with you up front.

One family planned around staying. Our whole-home remodel in Ballantyne Country Club was done in 2 phases because they wanted to keep living there. The first phase was the basement kitchen and an upstairs bathroom, which left them the main floor to live on. About a year later, we came back for the main-floor kitchen and living room.
If you stay, we might set up a temporary sink or relocate your washer and dryer so you can keep your laundry going. We use plastic sheeting walls, zipper doors, and air scrubbers to control dust, but in an open floor plan, some dust will still travel.
Know the realities before you decide:
- A kitchen can be gutted in the first week and not be usable again until the final inspection passes.
- A job site is a construction site, so keeping children and pets out of the work area as best you can is safest for everyone.
- If you and your family couldn’t go camping for a week without losing your minds, we suggest staying with family or renting a place instead.
What Happens Between Signing the Construction Agreement and Demolition Day?
Between signing and demolition day, your project manager takes over, sets your start date, and gets your house ready for the crew. Here’s the order it happens in:
- You sign the construction contract. If your plans were ready for a permit, we applied during pre-construction, so it may be ready that same day. If not, we apply around the time you sign.
- Your project manager takes over and schedules a kickoff meeting with you.
- Your project manager checks when slow-to-arrive items, like windows, will show up, because the start date depends on them.
- Your project manager announces your start date and runs the kickoff meeting.
- Floor protection and dust barriers go in, so the work doesn’t damage the rest of your house.
Your county issues the permit. Mecklenburg County, for example, requires them for alterations to 1- and 2-family homes, except for some jobs of $40,000 or less that don’t touch structure, plumbing, heating and air, electrical, or roofing.