Key Points

Pre-construction ends with a final scope of work and a fixed price we guarantee, in place of the price range you start with.
The permit is applied for during pre-construction if the plans are ready, or around the time the contract is signed. Then the project manager checks when slow items like windows will arrive, and a start date is set.
Staying in the house is the homeowner's call, but a kitchen can be gutted in week 1 and stay unusable until the final inspection passes.

You’re picturing the day the crew shows up, and the walls start coming down on your whole-home renovation. A lot of work happens before that day, and most of it is planning with you and the designer you work with.

You’ll learn:

  • What you get out of pre-construction
  • How long it takes
  • Who helps you make the decisions along the way
  • How to plan for what’s behind the walls
  • Whether you need to move out
  • What happens between signing and demolition day

What Happens First?

We have a discovery video call to find out if we’re the right fit for you. If we are, we come to your home for a consultation, and once there are plans to price from, we give you a preliminary budget: the range where we think your project will land.

The pre-construction phase comes next.


What Does the Pre-Construction Phase Actually Produce?

Pre-construction produces a final scope of work and a fixed price we guarantee, in place of the price range you start with.

In it, we take your preliminary budget down to the final penny: our team goes through the existing conditions of your house and every requirement of the project, using your final drawings and selections.

You’ll also see how the number got from the range to the final price, because we list each item that wasn’t in your preliminary budget and about what it added.


How Long Does Pre-Construction Take Before Demolition?

Plan on at least 3 to 4 months of pre-construction work with us before you sign the construction contract. Some clients take longer, like one client we worked with for a year before signing. How long it takes depends a lot on the designer’s schedule.

Kitchen peninsula with a white countertop, blue base cabinets, three woven stools, and open wood shelves stacked with dishes.

On our whole-home remodel in Historic Dilworth, it took 7 months to get from the preliminary budget to the final price, and then about 5 months to remodel the house, kitchen included.


Who Guides Us Through the Decisions Before Demolition?

Picking cabinets, countertops, tile, fixtures, lighting, and paint colors for a whole house is a headache at the beginning of a job. That’s why most of our clients work with an interior designer.

The designer you work with helps you through every selection. Then we get final prices from our vendors and trades for everything the designer picks.

If you don’t already have a designer, we can bring one to the table that has a winning track record and works seamlessly with you and our team.

Cabinet elevation drawing of a primary bath vanity with measurements and a note about an outlet behind a drawer.

In the plans for our Historic Dilworth remodel, the primary bath vanity is designed down to every cabinet size and where an outlet has to go. The designer works through details like these with our cabinet builder.


How Does the Price Plan for What’s Behind the Walls?

Before you sign, each licensed trade walks your house and checks its existing conditions against the plans, so every code update they can spot is in your fixed price.

What they can’t see is covered by a reserve of your own: keep 5 to 10% of your budget in a separate account, or about 15% for a house 50 or more years old. An older home has more history, more past mistakes, and more things that need updating for today’s code, so expect more to turn up.


Will We Need to Move Out?

Whether you live in the house during the renovation is up to you. It’s your home.

On some jobs, there’s so much work that the house won’t have working utilities, which we always discuss with you up front.

Kitchen with navy cabinets, a stainless refrigerator, an angled white countertop, and four upholstered counter stools.

One family planned around staying. Our whole-home remodel in Ballantyne Country Club was done in 2 phases because they wanted to keep living there. The first phase was the basement kitchen and an upstairs bathroom, which left them the main floor to live on. About a year later, we came back for the main-floor kitchen and living room.

If you stay, we might set up a temporary sink or relocate your washer and dryer so you can keep your laundry going. We use plastic sheeting walls, zipper doors, and air scrubbers to control dust, but in an open floor plan, some dust will still travel.

Know the realities before you decide:

  • A kitchen can be gutted in the first week and not be usable again until the final inspection passes.
  • A job site is a construction site, so keeping children and pets out of the work area as best you can is safest for everyone.
  • If you and your family couldn’t go camping for a week without losing your minds, we suggest staying with family or renting a place instead.

What Happens Between Signing the Construction Agreement and Demolition Day?

Between signing and demolition day, your project manager takes over, sets your start date, and gets your house ready for the crew. Here’s the order it happens in:

  • You sign the construction contract. If your plans were ready for a permit, we applied during pre-construction, so it may be ready that same day. If not, we apply around the time you sign.
  • Your project manager takes over and schedules a kickoff meeting with you.
  • Your project manager checks when slow-to-arrive items, like windows, will show up, because the start date depends on them.
  • Your project manager announces your start date and runs the kickoff meeting.
  • Floor protection and dust barriers go in, so the work doesn’t damage the rest of your house.

Your county issues the permit. Mecklenburg County, for example, requires them for alterations to 1- and 2-family homes, except for some jobs of $40,000 or less that don’t touch structure, plumbing, heating and air, electrical, or roofing.


Ready to Plan Your Whole Home Renovation With Watershed Builders?

If you’re planning a whole-home remodel, we’d be glad to talk it through with you and show you how pre-construction would work for your house.

Fill out our contact form or give us a call.

author avatar
Dominick Thompson

Frequently Asked Questions

Do we need to choose every finish before demolition starts, or can we decide some things during construction?

Plan on making every selection before you sign the construction contract, from cabinetry, countertops, and tile to plumbing fixtures, decorative lighting, and floor and wall colors. If a question is going to need an answer during the project, the time to answer it is before the contract is signed, whenever that's possible.

Do we pay for anything before demolition?

You pay 1% of the low end of your preliminary budget as earnest money when you sign the pre-construction agreement, and it's applied to the construction cost of your job. When you sign the construction contract, you also pay a construction deposit. On some jobs, there's a large upfront payment for materials that have to be paid for before they can be ordered, like half of the cabinet cost or all of the windows in full, because we're buying very expensive things for your job.

Read More From Watershed Builders

White kitchen with a large island, a stone countertop, two glass globe pendants, and three black spindle-back stools.

How Do I Vet a High-End Remodeler?

To vet a high-end remodeler, confirm the license and insurance, look at finished projects like yours, and compare what each...